WHAT HAVE BEEN ACCOMPLISHED:

The project included financing, design and construction of two major new bridges and 4 km of highways and demolition of an existing bridge across the St. Lawrence River in Montreal, Canada.   The new bridge has a three-corridor design, including two three-lane corridors for vehicular traffic, a two-lane transit corridor and a multi-use pedestrian and bike path.

JMEC has been structural consultant for the design-build team and providing design and construction phase services for the signature cable stayed bridge, including ancillary items and the structural components necessary for inspection and maintenance of both the inside and outside of the bridge.   These included the access walkways inside the steel box girders, maintenance gantries under the bridge with access via exterior platforms, elevators and ladders for tower interior, and davit cranes with suspended platforms/rope access for tower exterior.
Project Role:  Subconsultant for Bridge Design

Clients:  T.Y. Lin International

Project Status:   Open to traffic on June 24, 2019
Corporate Office
165 Lennon Lane, Suite 106, Walnut Creek, CA 94598
Tel:  (925) 944-8999      Fax: (925) 944-9998


Copyright © 2024 JMEC Engineering Inc.  All rights reserved.